CHECK OUR EXAMPLES OF CHECKING FIXTURES

Foglamp trim checking fixture

Checking fixture for foglamp trim with an aluminium founding basis

  • Positionning of the left and right fixtures in vehicle position by an aluminium founding basis
  • Simulation of the part clipping system by steel clips submitted to a chemical nickel treatment
  • Simulation of the vehicle environment of the part by sliding blocks that can be put aside easily and quickly to mount and dismount the part. Control of the part outline by Go/No Go gauge.
  • Control of the length of the part by one dial indicator point.
  • Control of the dimensions of the foglamp hole by a Go/No Go pin.

Checking fixture for foglamp trim with an aluminium base plate

  • Positionning of the left and right fixtures in vehicle position by an aluminium block adapted on the fixtures base plate
  • Simulation of the part clipping system by steel clips submitted to a chemical nickel treatment
  • Possibility to mount two versions of trims: with or without foglamp.
  • Simulation of the part vehicle environment by fixed blocks.
  • Control of the part shape by six dial indicator control points: outline and surface deformation.
  • 2D of the checking fixture.
  • 2D of the foglamp version of trim.

Description

As foglamp trims are part of the visible components of the car, its aspect and shape are of paramount importance. Consequently, the fixture controlling this type of part must be able to guarantee its dimensional conformity without damaging scraping it or tearing it, thus protecting its finishing.

Materials and tolerances

Our checking fixtures are produced in aluminium, the components submitted to wear-and-tear are produced in steel. Tolerances for RPS (fixation points) and dial indicator points: ±0.05mm. Tolerances for simulation blocks: ±0.1mm.

Documentation delivered

Minimum documentation: dimensional report of your checking fixture, 2D assembly drawing, assembly CAD.  Optional documentation: R&R report, user manual, stabilization certificate.

Cycle time and traceability

In order to reduce the time to repay your fixture, think about using automated data acquisition solutions, which will help you reduce your measuring cycle time.  See CAPTOR-S presentation video to see an example of measurement time reduction on a checking fixture for a plastic part.



For more information and estimates




TECNOMATRIX BCN SL ha recibido una ayuda para la ejecución del proyecto de Investigación y Desarrollo con título “SISTEMA INTERACTIVO Y COLABORATIVO CON MODELADO PREDICTIVO PARA LA OPTIMIZACIÓN Y GESTIÓN EFICIENTE E INTELIGENTE DE PROCESOS PRODUCTIVOS” y número de expediente IDI-20180567, a través del Centro para el Desarrollo Tecnológico Industrial (CDTI).El objetivo global perseguido es el desarrollo de un sistema de análisis de futuros proyectos que permita predecir con exactitud y de forma autónoma, sin depender de ningún otro departamento, la fecha de entrega prevista a los clientes en función de la situación actual de carga de trabajo, condiciones técnicas del propio proyecto, condicionantes del cliente, etc. y que permita reducir los tiempos muertos, microparadas y las incidencias en proyectos, para que se pueda reducir el planning de entrega. Partiendo para ello de la digitalización de la información y planificación de los proyectos y posterior análisis y definición de patrones que permitirá el desarrollo de un modelo predictivo. Dicho sistema se basa en una plataforma Big Data integrada en el CRM (Salesforce) de la compañía para que sea de fácil acceso para el personal de cualquier departamento.El proyecto se desarrolla en las instalaciones de Barcelona durante las anualidades de 2018 – 2019, y con un presupuesto de ejecución de 364.358€.